
Fangcheng Bao 5 Mileage Blocker 2022–2026 – Long Lead
Enter the coupon code at checkout to apply your discount.
For off-road, testings, dyno and development use only.
Overview
Long-lead mileage blocker for Fangcheng Bao 5, prepared for workshop, dyno and controlled test applications.
Compatibility
- Model: Fangcheng Bao 5
- Compatible model years: 2022–2026.
- Match the vehicle build, powertrain and instrument-cluster connector before ordering.
Key features
- Long-lead version.
- Product price: £350.
- Plug-in connections.
- Remembers the selected operating mode.
Installation
Use a qualified installer and the instructions supplied for the actual module. Check the vehicle and harness before work, follow the manufacturer’s electrical shutdown procedure, and verify normal operation before testing.
Activation and mode selection
Depending on the vehicle configuration, change modes by holding RES for ten seconds or pulling the high-beam lever four times. Repeat the supported control to cycle through the modes.
Modes
- Mode 1: approximately no distance recorded; normal cluster speed unavailable.
- Mode 2: approximately one-tenth of distance and speed displayed.
- Mode 3: normal distance recording restored.
There is no audible or flashing mode confirmation. Check operation during a controlled test and verify normal operation after selecting Mode 3.
Fitting can be complex; specialist installation is recommended.
Important information
For controlled off-road testing and development. Contact our team with the VIN, build year, powertrain and dashboard/connector photographs to confirm fitment.
| Installation | Plug & Play |
|---|---|
| SKU | BYD1-FANGCHENGBAO5-LL-PARENT |
Is it difficult to install?
No. This module is plug-and-play — no cutting, soldering or coding required. Most installs take under 30 minutes.
Will it leave any errors after removal?
No. The module saves the last setting and leaves no error messages or mileage jump after removal.
Is it covered by a warranty?
Yes — every module comes with a 6-month warranty against manufacturing faults, plus our hassle-free 14-day returns. Please note our products are supplied strictly for off-road, testing, dyno and development use only.
Fangcheng Bao 5 Mileage Blocker 2022–2026 – Long Lead





Reviews
There are no reviews yet