Specialist vehicle testing modules for professional workshop and development use.
BYD

BYD Seal Mileage Blocker 2022–2026 – Long Lead

SKU: BYD1-SEAL-LL-PARENT
£350.00+ VAT
VAT is only charged for UK customers and is added at checkout.
Plug & PlayNo coding or specialist tools
Mileage DataAccurate, reliable readings
OBD ReadyCompatible with OBD systems
Secure ChipTamper-proof encrypted module
Dispatched within 24 hoursMon–Fri
International delivery3–7 days via FedEx
14-day returnsHassle-free, no questions asked
Need help choosing?Our experts are available 9am–6pm Mon–Fri
Multi-Buy Savings
10% OFF
Save 10% on 2+ unitsBuy 2 or more of any module
10%OFF
20% OFF
Save 20% on 5+ unitsBuy 5 or more of any module
20%OFF

Enter the coupon code at checkout to apply your discount.

For off-road, testings, dyno and development use only.

Overview

Long-lead mileage blocker for BYD Seal, prepared for workshop, dyno and controlled test applications.

Compatibility

  • Model: BYD Seal
  • Compatible model years: 2022–2026.
  • Match the vehicle build, powertrain and instrument-cluster connector before ordering.

Key features

  • Long-lead version.
  • Product price: £350.
  • Plug-in connections.
  • Remembers the selected operating mode.

Installation

Use a qualified installer and the instructions supplied for the actual module. Check the vehicle and harness before work, follow the manufacturer’s electrical shutdown procedure, and verify normal operation before testing.

Activation and mode selection

Depending on the vehicle configuration, change modes by holding RES for ten seconds or pulling the high-beam lever four times. Repeat the supported control to cycle through the modes.

Modes

  • Mode 1: approximately no distance recorded; normal cluster speed unavailable.
  • Mode 2: approximately one-tenth of distance and speed displayed.
  • Mode 3: normal distance recording restored.

There is no audible or flashing mode confirmation. Check operation during a controlled test and verify normal operation after selecting Mode 3.

Fitting can be complex; specialist installation is recommended.

Important information

For controlled off-road testing and development. Contact our team with the VIN, build year, powertrain and dashboard/connector photographs to confirm fitment.

InstallationPlug & Play
SKUBYD1-SEAL-LL-PARENT
Is it difficult to install?

No. This module is plug-and-play — no cutting, soldering or coding required. Most installs take under 30 minutes.

Will it leave any errors after removal?

No. The module saves the last setting and leaves no error messages or mileage jump after removal.

Is it covered by a warranty?

Yes — every module comes with a 6-month warranty against manufacturing faults, plus our hassle-free 14-day returns. Please note our products are supplied strictly for off-road, testing, dyno and development use only.

Reviews

There are no reviews yet

Add a review
BYD Seal Mileage Blocker 2022–2026 – Long Lead BYD Seal Mileage Blocker 2022–2026 – Long Lead
Rating*
0/5
* Rating is required
Your review
* Review is required
Name
* Name is required
Add photos or video to your review
* Please tick the checkbox to proceed
* Please confirm that you are not a robot
BYD Seal Mileage Blocker 2022–2026 – Long Lead £350.00 +VAT
Add to Basket